F1 COMPOSITE — ACCEPTANCE AND HANDOVER CHECKLIST Project planning record. Set project-specific criteria before using this sheet. This checklist does not certify a machine or qualify a finished product. Project / revision / date: Equipment / tooling IDs: Material grades / lots: Responsible parties: For each item record: criterion | result | evidence | owner | open action. DESIGN RELEASE [ ] Product and inspection drawings approved [ ] Material candidates and qualification requirements agreed [ ] Tool / preformer / fixture drawings and interfaces agreed [ ] Scope, utilities and buyer/supplier responsibilities agreed [ ] FAT, SAT and product qualification plans approved FACTORY ACCEPTANCE (FAT) [ ] Delivered equipment configuration matches purchase scope [ ] Tooling IDs, mounting/alignment and guides checked [ ] Dosing / heating / controls checked to approved methods [ ] Representative materials and process records identified [ ] Agreed trial completed with sample and inspection records [ ] Deviations logged; corrective actions and release conditions agreed SITE ACCEPTANCE (SAT) [ ] Site utilities and receiving-factory readiness confirmed [ ] Installation and interface checks completed by responsible parties [ ] Local operation trial completed against agreed acceptance criteria [ ] Operator training and competency records complete [ ] Open items assigned with owner and completion date PRODUCT QUALIFICATION [ ] Named material / reinforcement / section / process identified [ ] Required product tests completed and reviewed [ ] Acceptance authority signs the product-release decision [ ] Changes and substitutions require the agreed review process HANDOVER AND AFTERCARE [ ] Approved drawings and material BOM delivered [ ] Trial, inspection and product-test records delivered [ ] Supplier manuals and control/document access confirmed [ ] Wear parts, spares and maintenance schedule agreed [ ] Ownership / licensing / confidentiality terms recorded [ ] Support contacts, duration and warranty responsibilities identified [ ] Handover signed; remaining actions recorded F1 coordination and supplier responsibilities follow the signed engagement. Contact: inquiry@f1composite.com https://www.f1composite.com/technology/knowhow-services