Bar configuration
Specify solid or hollow construction, diameter, thread or surface geometry, length and any coupler arrangement. Each construction needs its own qualification.
Specify solid or hollow construction, diameter, thread or surface geometry, length and any coupler arrangement. Each construction needs its own qualification.
Nut, plate, washer and connection details must match the bar and required installation procedure. Assess the full assembly capacity.
Identify cementitious grout or resin cartridge, borehole geometry, installation equipment, cure conditions and acceptance testing.
Send the required configuration for review. The quotation confirms availability, production or sourcing scope, tooling, minimum order, documents and delivery. Performance values must come from the offered grade and assembly.
CHECK 1
Evaluate tensile rupture, bar shear across joints or bedding planes, thread stripping, plate bearing, bond failure and displacement. The nominal tensile strength of a bar alone is insufficient to specify the anchor.
CHECK 2
State service duration, sustained load, groundwater chemistry and temperature. For permanent support, expect a sustained-stress limit well below the short-term tensile strength and request creep-rupture evidence (ASTM D7337/D7337M) for the offered bar.
CHECK 3
The responsible ground-support designer defines the support pattern and acceptance tests. Cut-through behavior, mine fire requirements and other special conditions require project-specific confirmation.
Only a qualified ground-support design can establish suitability. A concrete reinforcing bar does not automatically include the thread, nut, plate and bond performance needed for a rock-bolt assembly.
No. The tunnel designer and equipment requirements determine acceptability. Submit the cutting, load, installation and testing requirements with the inquiry.
Custom profile development →Review available product evidence →
Start with a drawing and the intended use. These details help define the proposed supply package and qualification plan. We reply within one business day; a formal quotation follows once the specification and delivery are reviewed.