FRP vs steel life-cycle cost calculator
Put your quotes for an FRP and a steel option side by side over the life of the project: installed cost, maintenance, inspection, replacement and shutdowns, as present values.
- Method
- Present value, ISO 15686-5
- Galvanizing life
- ISO 9223 · ISO 1461
- Costs
- Yours, any currency
Last updated
Study
Costs are in any one currency. The starting figures are an example on an index where the installed steel option costs 100; replace them with your quotes. A real discount rate excludes inflation.
Steel option
Zinc loses 4.2–8.4 µm a year in C5, so 85 µm lasts about 10–20 years; the first maintenance is set to the middle, 13 years. Atmospheric exposure only: splash, immersion and chemical service corrode faster.
ISO 12944-1 paint durability classes: L up to 7 years, M 7–15, H 15–25, VH over 25.
FRP option
Match maintenance to the offered resin, surface and exposure. The example includes one surface-care event at year 25 only to illustrate the arithmetic; it is not a product-life or coating-life prediction.
Cumulative cost, present value
Year-by-year table
| Year | Steel | FRP |
|---|---|---|
| 0 | 100 | 130 |
| 1 | 100 | 130 |
| 2 | 100 | 130 |
| 3 | 100 | 130 |
| 4 | 100 | 130 |
| 5 | 100 | 130 |
| 6 | 100 | 130 |
| 7 | 100 | 130 |
| 8 | 100 | 130 |
| 9 | 100 | 130 |
| 10 | 100 | 130 |
| 11 | 100 | 130 |
| 12 | 100 | 130 |
| 13 | 127 | 130 |
| 14 | 127 | 130 |
| 15 | 127 | 130 |
| 16 | 127 | 130 |
| 17 | 127 | 130 |
| 18 | 127 | 130 |
| 19 | 127 | 130 |
| 20 | 127 | 130 |
| 21 | 127 | 130 |
| 22 | 127 | 130 |
| 23 | 127 | 130 |
| 24 | 127 | 130 |
| 25 | 127 | 135 |
| 26 | 127 | 135 |
| 27 | 127 | 135 |
| 28 | 145 | 135 |
| 29 | 145 | 135 |
| 30 | 145 | 135 |
| Item | Steel | FRP |
|---|---|---|
| Installed cost | 100 | 130 |
| Maintenance | 44.7 | 4.8 |
| Inspection | 0 | 0 |
| Replacement | 0 | 0 |
| Shutdown or access | 0 | 0 |
| Unused life credit | 0 | 0 |
| Total | 145 | 135 |
| Equivalent per year | 7.4 | 6.9 |
Steel events: maintenance year 13, maintenance year 28. FRP events: maintenance year 25.
FRP installed costPlanning price ranges per meter in the price estimatorCompare two options that deliver the same function
First establish equivalent usable area or member duty, span, loads, deflection, environment and required service period. Each quote should include its own designed supports, fixings, fabrication, protection, transport and installation. This cost tool does not establish structural equivalence.
Use one currency and one price-date basis. The model adds installed cost, recurring maintenance, annual inspection, replacement and a common downtime/access cost per event, then optionally credits unused replacement life. Future costs are discounted by C / (1 + r)t using a real rate and constant-price assumptions.
Taxes, financing, inflation, disposal and carbon impacts are not separate model inputs. Replacements repeat the initial installed cost and maintenance pattern; residual credit is straight-line. An event exactly at the end of the study is excluded. Check whether those assumptions suit your appraisal and compare sensitivities.
Worked example using the tool's starting cost index
| Input or result | FRP option | Steel option |
|---|---|---|
| Installed cost index | 130 | 100 |
| Maintenance cost per event | 10 | 40 |
| Maintenance years within the study | 25 | 13, 28 |
| Present-value total cost index | 134.78 | 144.72 |
Study: 30 years; real discount rate: 3%; annual inspection and downtime costs: zero; no replacement within the study, hence no residual credit. FRP total = 130 + 10 / 1.03²⁵. Steel total = 100 + 40 / 1.03¹³ + 40 / 1.03²⁸. Those assumptions make FRP lower by 9.95 index points. Change the inputs above to see whether the conclusion holds for your project.
Galvanizing life by corrosivity category
| Category | Zinc loss (µm/year) | 85 µm coating | 70 µm coating | 55 µm coating |
|---|---|---|---|---|
| C2 low: dry rural, unheated buildings | 0.1–0.7 | 121–100+ years | 100–100+ years | 79–100+ years |
| C3 medium: urban, mild coastal | 0.7–2.1 | 40–100+ years | 33–100 years | 26–79 years |
| C4 high: industrial, coastal | 2.1–4.2 | 20–40 years | 17–33 years | 13–26 years |
| C5 very high: humid industrial, salt-laden coastal | 4.2–8.4 | 10–20 years | 8–17 years | 7–13 years |
| CX extreme: offshore, extreme industrial | 8.4–25 | 3–10 years | 3–8 years | 2–7 years |
ISO 1461 minimum mean coatings for non-centrifuged steel articles: 85 µm over 6 mm thick, 70 µm over 3 up to 6 mm, 55 µm from 1.5 to 3 mm. See the Galvanizers Association scope and table. Actual coatings can be thicker, which lengthens this arithmetic estimate in proportion. First-year rates do not predict a whole structure's life; splash, immersion and chemical fumes require a different review. For the FRP side, see the FRP vs steel grating comparison and the worked grating cost example.
Frequently asked questions
How is the life-cycle cost calculated?
Each cost is brought back to today with a real discount rate: a cost C in year t counts as C / (1 + r)^t. The total adds installed cost, maintenance events, yearly inspection, replacements and the shutdown or access cost of each event. When residual credit is enabled and a replacement life is defined, the model deducts the discounted straight-line value of the unused life at the end of the study. The calculation uses present-value life-cycle costing; the project appraisal defines the assumptions.
How long does hot-dip galvanizing last?
Coating thickness divided by a zinc corrosion rate gives an arithmetic screening estimate. ISO 9223 first-year rates include 0.7 to 2.1 µm/year in C3 and 4.2 to 8.4 µm/year in C5. For non-centrifuged steel articles over 6 mm thick, the ISO 1461 minimum mean coating thickness is 85 µm. Using that 85 µm example gives about 10–20 years in C5 and 40–121 years in C3; these are not guaranteed coating or structure lives. First-year rates are not long-term rates, and splash, immersion and specific chemical conditions require a separate assessment.
Which discount rate should I use?
Use the real rate required by your organization's project appraisal, consistent with the tool's constant-price costs. It excludes inflation. A higher rate reduces the present value of later costs, so compare several rates alongside maintenance and replacement assumptions to see whether the result changes.
Does FRP need maintenance?
FRP requires inspection and a maintenance plan for the offered resin, finish, exposure and connections. Surface renewal or other work may be needed. The example puts a surface-care event at year 25 to demonstrate the arithmetic, not to predict a coating life. Replace it with the interval and cost supported for your project.
When is steel the cheaper choice?
Steel can be cheaper when its installed quote is lower and the project's future maintenance and replacement costs do not offset that difference. Test both options using equivalent performance and scope, then vary maintenance timing, access costs and the discount rate. An atmospheric category alone does not decide the result.
Replace the example with a real FRP quote
Send the steel scope, loads and environment you are pricing. We can review an FRP option and define the supply and evidence needed for a comparable quote. We reply within one business day.